问题标题:
英语翻译1、Intheendoftheconstructionshouldbepresentedthefinallocationofthepipes,inaCDincludingeverymaterialsandworksassociated.2、ExecutionofalltestsandexperencessolicitedintheContractSpecificationorbytheCons
问题描述:
英语翻译
1、Intheendoftheconstructionshouldbepresentedthefinallocationofthepipes,inaCDincludingeverymaterialsandworksassociated.
2、ExecutionofalltestsandexperencessolicitedintheContractSpecificationorbytheConstructionSupervision,includingeverymaterialsandworksassocisted.
3、TechnicalAssistanceduringthetimeofguaranteeifallmaterialsandequipments,includingeverynecessaryworksandaccessories.
李钟辉回答:
1.建设工作收尾时应标出管道的最终定位点,存单中要包括所有材料及相关机件.
2.合同细则或是在建设监理要求下的各种试验及经验的应用,包括所有材料及相关机件.
3.针对所有材料及设备,包括各种机件和配件的技术支持.
点击显示
英语推荐
热门英语推荐